News & Events

Apr-2010

MBM start to undertake stage 1

for a new build design. i.e. G.A,

Bid preparation and Build cost

analysis

Read More > ---------------------------------------------------------

Mar-2010

MBM undertakes weather route

analysis for a vessel and her cargo

to gain vessel and cargo

accelerations

Read More > ---------------------------------------------------------

Feb-2010

MBM launches new website

Read More > ---------------------------------------------------------

Jan-2010

New naval architecture software

and services within MBM for 2010

Read More > ---------------------------------------------------------

Dec-2009

Strength of MBM enters 2D wire

frame FEA of hatch-covers

Read More > ---------------------------------------------------------

Dec-2009

Large project cargo's are on the

horizon for MBM from the oil

industry

Read More > ---------------------------------------------------------

Dec-2009

Cradle design to transport a 460t

Tug from China

Read More >

---------------------------------------------------------

Sept-2009

Innovative design to transport

windmill towers in upright position

Read More >

 

 

Quick Links

BritishShipping Link InternationalMaritimeBureau InternationalMaritimeBureauLink RoyalInstituteOfNavalArchitects TheRoyalInstituteOfNavalArchitectsLink Lloyd'sList LloydsListLink ICCworldBusinessOrganisationLink

> Home >> Past Projects >> A 460t Tug

460 ton Tug from China to Chile:

• Clients

-

Ian Taylor & Company, BBC Chartering & Logistics

• Cargo

-

460 ton Tug.

• Project

-

Design lifting lugs & transport cradle.

• Surveying company

-

BMT.

• Vessels

-

BBC Asia, Dwt 7500mt, 2x250t cranes.

• Cradle basic principles

-

5.5m and 8m height, High tensile AH36 steel.

 

Project dates.

 

Commenced

-

28th

Oct 2009

Cradle approved

-

5th

Jan 2010

Loaded

-

15th

Feb 2010

Discharged

-  

March 2010

 

• Input

-

Ian Taylor & Company provided a basic GA of the 460 ton tug.

• Output

-

With MBM’s in-house skills a 3D hull form was generated. This later enabled a close approximation for the cradle connection between the vessel and cradle contact surface to be generated.

• Input

-

BBC provided the upcoming stowage arrangement of vessel, BBC Asia.

• Output

-

MBM used this information to generate all vessel motions and forces expected for the cargo, and implement these onto the cradle designs and vessel structure. The results were provided in Technical reports which met the high standards of the BMT surveyors.


The reports included, lifting lug calculations, structural strength calculations for the cradles, the cradle stoppers, and the hatch-covers. These structural strength calculations included the stress, strain, deflection, buckling, and weld strengths. 

The reports also provided the final manufacturing engineering drawings for the cradles and stoppers, and the stowage locations of the cradles to assist the Port captains during the loading operations.

420ton Tug Aft_Wire 420ton Tug Aft 420ton Tug Fore_Wire

 

 

 

 

Crane model pictures.

-------------------------------------------------------------------------------------------------------------------------

Lifting lugs:

An analysis was requested to design a set of lifting lugs for the 460t Tug. The most appropriate locations were agreed with the BMT surveyors to be the bulkheads at Frame 11 and 49. The result was a lifting lug design with cover plate using a Green pin lifting shackle.

Lifting Lugs designed by MBM

 

 

 

 

 

 

 

 

 

 

 

 

The MBM designed lifting lugs port & stbd at Frame 11 with a Green pin shackles.

Cradles in position on Hatch covers, 460t Tug alongside Aft view of loaded 460 Ton Tug on Hatches Fwd view of 460 ton Tug on Hatches
Aft high view of 460ton Tug loaded on hatches

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The 460ton Tug being loaded successfully.

 

“ FROM THE LIFTING LUGS TO THE CRADLE,
NO JOB IS TOO BIG OR TOO SMALL.
NO DETAIL IS OVERLOOKED,
WE UNDERTAKE IT ALL ”

(Contact Us)