News & Events

Apr-2010

MBM start to undertake stage 1

for a new build design. i.e. G.A,

Bid preparation and Build cost

analysis

Read More > ---------------------------------------------------------

Mar-2010

MBM undertakes weather route

analysis for a vessel and her cargo

to gain vessel and cargo

accelerations

Read More > ---------------------------------------------------------

Feb-2010

MBM launches new website

Read More > ---------------------------------------------------------

Jan-2010

New naval architecture software

and services within MBM for 2010

Read More > ---------------------------------------------------------

Dec-2009

Strength of MBM enters 2D wire

frame FEA of hatch-covers

Read More > ---------------------------------------------------------

Dec-2009

Large project cargo's are on the

horizon for MBM from the oil

industry

Read More > ---------------------------------------------------------

Dec-2009

Cradle design to transport a 460t

Tug from China

Read More >

---------------------------------------------------------

Sept-2009

Innovative design to transport

windmill towers in upright position

Read More >

 

 

Quick Links

BritishShipping Link InternationalMaritimeBureau InternationalMaritimeBureauLink RoyalInstituteOfNavalArchitects TheRoyalInstituteOfNavalArchitectsLink Lloyd'sList LloydsListLink ICCworldBusinessOrganisationLink

> Home >> Past Projects >> 4 x 185 ton RTG's

4 x 185 ton RTG's:

The loading of some cargo’s require more strength analysis than just the final position as can be seen in the loading of the 4 x 185ton RTG’s loaded in China.

 

Plan of cargo in final position on Hold 1.

Plan of cargo in final position on Hold 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The cargo was loaded onto the vessel hatches between the vessel cranes and the aim was to roll the cargo forward or aft to reach their final stowage positions.

 

The hatch covers were initial analysed with a rolling load. This was to determine the strength at each position during the movement as the cargo is driven along a sandwich of wood/steel plates for weight spreading.

 

Cargo rolling on hatch.

Picture of cargo rolling on hatch

 

 

 

 

 

 

 

 

 

 

 

 

The second analysis, is the transfer of the cargo from one Hold 2 to Hold 1 with a maximum distance between holds of 4.5m.

 

A simple “bridge” was confirmed adequate to transport the cargo from Hold 2 to Hold 1.

 

 

“bridge” between Hold2 to Hold 1.

Picture of “bridge” between Hold2 to Hold 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The cargo was loaded, secured and safely transported to the client.

 

 

All 4 x 185ton RTG’s loaded on 12000Dwt MPV.

All 4 x 185ton RTG’s loaded on 12000Dwt MPV between Hold2 to Hold 1.